Built for LGED, PWD & RHD government tenders

Upload your BOQ PDF.
Get a cost estimate
in minutes.

No manual typing. No formulas. No formatting. Drop your Bill of Quantities and walk away with a clean, ready-to-share estimate in Excel.

10×faster than manual estimation
2 minaverage processing time
৳0setup cost to try it
boq-gulshan-tower.pdf
1 — Messy BOQ PDF
READING
MATCHING RATES
CALCULATING
2 — Auto-read & matched
estimate-gulshan-tower.xlsx
Item
Qty
৳ Amount
Brick work
420 m³
14,70,000
RCC (MS rod)
86 m³
62,28,000
Plaster
1,240 m²
7,44,000
Tile flooring
680 m²
13,60,000
Paint
1,960 m²
3,52,800
Total
1,01,54,800
3 — Clean Excel estimate

Estimation shouldn't eat your whole week.

01

Messy PDFs nobody can read.

Every client sends a BOQ in a different format. Scans, screenshots, tables that break across pages. Someone has to retype it all.

02

Hours of manual work.

Copying items into Excel. Looking up rates. Cross-checking quantities. It takes days — and you still have to submit on time.

03

One small mistake, big problem.

A decimal in the wrong place. A missed line item. A rate from last year. Small errors quietly wipe out your margin.

04

Hunting for the right rates.

Is this a PWD rate? What's today's price for MS rod or cement? The answers live in ten different files — or one senior's head.

Everything you need. Nothing you don't.

Unit rate analysis.

Search any work item across PWD, RHD & LGED. See full material, labour, and overhead breakdown — free, forever.

LGED Item3.12.09

Maintenance and protection of traffic at all times along existing roads…

32%match

BOQ Estimation.

Upload your BOQ PDF — every row auto-matched, unit prices editable, VAT & overhead built-in. Export clean BOQ & MOQ to Excel.

PDFXLSX
estimate-silo-retrofit.xlsx↓ Export

Chat with your BOQ.

Plain-English answers from your most recent estimation. Explanations, comparisons, cheaper alternatives.

What's the total estimate?
Your full estimate comes to ৳ 6,14,81,573.Civil · ৳4.2 Cr  ·  Steel · ৳1.6 Cr
Any cheaper tile option?

Like having an expert estimator on call.

Don't dig through pages. Just ask. Your BOQ is right there, and it answers in a language everyone on site understands.

AskWhat's the total cost of the project?AskExplain this item in plain words.AskSuggest a cheaper material option.
BA
BOQ AnalyzerReviewing • boq-tower-b.pdf
Online
What's the total estimate for this BOQ?
Your full estimate comes to৳ 1,01,54,800
Civil works৳ 76,98,000Finishes৳ 13,60,000Paint৳ 3,52,800Misc.৳ 7,44,000
Explain the RCC line in simple words.
RCC is your reinforced concrete for slabs and columns — cement, stone chips, sand, and MS rod. You have 86 m³ of it at roughly ৳ 72,000/m³ — that covers materials, mixing, and placing.
Any way to save on flooring?
Switching from homogeneous tile to ceramic in service areas could trim about ৳ 3,20,000 without affecting public-facing spaces. Want me to mark those rooms?
Ask anything about this BOQ…

The kind of results that actually matter on site.

3days → min

Hours saved, weekly.

What used to take your team three days now takes a lunch break.

99%

Fewer calculation slips.

Consistent rates, matched items, no typos hiding in row 847.

1click

From PDF to Excel.

Drop the file. Download the estimate. That's it.

0training

Anyone on the team can use it.

If they can send a WhatsApp, they can run an estimate.

Built for government tenders
LGED
PWD
RHD

Things people ask us first.

Do I need to format my BOQ in a specific way? +
No. Upload your PDF exactly as you received it. Any layout, any length — the system reads it as it is.
How accurate are the rates? +
Rates come from current regional references and are shown clearly before you finalise. You can review, edit, or replace any rate in one click before downloading.
Can my whole team use it? +
Yes. Your team can sign in and work on the same projects, share estimates, and hand files off without anyone re-typing anything.
Is my data safe? +
Your files are yours. They stay private to your account, and you can delete them any time — no questions.
What if the BOQ has handwritten notes or scans? +
Upload it anyway. The system handles scanned pages and mixed layouts. Anything it's unsure about is flagged for you to confirm before the estimate is finalised.
How do I get started? +
Create an account, upload your first BOQ, and you'll have a downloadable estimate before your tea gets cold.

Simple, credit-based pricing.

Start free. Only pay for what you use. Buy credits when you need them — they never expire.

Limited-time launch offer

100 free credits৳199 value on every new signup.

Enough to estimate your first big project end-to-end — auto-match PDF rows, run cost build-ups, and export BOQ & MOQ. Credits apply to BOQ Estimation only; AI Chat requires a paid top-up. No card required to start. Offer ends soon.

Claim 100 creditsNo credit card · Sign up in 60 seconds
Free forever

Unit Rate Search

Search PWD, RHD, and LGED rates instantly. Browse full ingredient breakdowns, regional rates, and SoR records.

0/forever
  • PWD, RHD & LGED rate lookup
  • Full ingredient breakdowns
  • Regional rate comparison
  • Unlimited searches
Get started free
Paid top-up only

AI Chat

Ask questions about your BOQ in plain language. Get explanations, comparisons, and material suggestions on demand.

1.99/10 messages
1 credit for 10 AI chat messages
  • Plain-language BOQ Q&A
  • Rate & material explanations
  • Cheaper alternative suggestions
  • Chat history saved
Note: AI Chat is not covered by the 100 free signup credits. Requires a paid top-up.
Try AI chat

1 Credit = ৳1.99. No subscription. No expiry. Top up whenever you need more.

Start estimating now.
Upload your first BOQ free.

No credit card. No setup call. Just you, your PDF, and a finished estimate in a few minutes.

Let's talk about your construction workflow.

Contact information

Headquartered in Dhaka. Serving construction teams across Bangladesh.

Office

Level 2, Road #21/A, House #05
Nikunjo-02, Dhaka 1229

View on Google Maps →

Send us a message